PROMISED LAND NETWORK  ·  Land, homes, power & water, built together
Network companies
Rogue ModularPREFABRICATED STRUCTURES
Rendering of Rogue Modular apartments for Breath of Life Bandon

Modular homes & apartments · Medford, Oregon

Reliable by nature. Rogue by design.

Fire-resilient modular homes, ADUs and apartments with non-combustible Type II construction, built in southern Oregon and set on site in weeks.

50%Faster projects
Up to 90%Less on-site labor
Type IINon-combustible, insurable construction
$2,500Deposit to reserve your build

Why steel

Homes that don't burn, rot or warp.

Wildfire has changed what it takes to build and insure a home in Oregon. Rogue Modular builds with steel framing and fire-resistant sheathing from the start, so the structure itself is part of the protection.

  • Type II construction. Non-combustible and insurable.
  • Steel framing. Light-gauge steel that stays straight and won't feed a fire.
  • Fire-resistant sheathing. ZS2 TechBoard cementitious panels and 2" aircrete panels.
  • Built for efficiency. Net-zero-ready, with a lower carbon footprint and lower cost of ownership.
Modular units under construction inside the factory
Light-gauge steel wall framing
Steel roof trusses

Floor plans

From a 420 sq ft studio to a five-bedroom home.

Every plan works as a stand-alone home, attached or stacked. Call for the plan flyer, pricing and options.

PlanSizeBedsBaths
SF Plan 011,920 sq ft32.1
SF Plan 022,304 sq ft53
SF Plan 031,344 sq ft32
SF Plan 041,344 sq ft32
SF Plan 051,350 sq ft32
Faloma1,264 sq ft32.1
Villa1,120 sq ft22.1
Cottage798 sq ft21.1
Bungalow560 sq ft11
Hideaway420 sq ftStudio1
Custom homes, ADUs and apartments: our design team will walk you through the options.Ask about the 3-D tour of our two-bedroom, 914 sq ft single-module home, a manufactured-home replacement.
Modular homesADUsApartmentsCondominiumsOff-grid cabinsPad-lot subdivisionsCottage clustersManufactured-home replacementRural and difficult sitesVacation rentals

Multifamily

Apartments, townhomes and condos, with a guaranteed price and schedule.

Modules are built in the factory while the site is prepared, then set in days. A 24-unit building takes about 8 weeks of off-site construction and about 2 weeks of setting on site.

Bandon North rendering

Bandon, Oregon

Bandon North

  • 20 accessible units from 46 modules
  • Two stories with an elevator
  • Accessible rooftop deck
Modular wall panels being set by crane in Medford

Medford, Oregon

Breath of Life Medford, Phase 1

  • 24 apartments from 36 modules
  • Three-story walk-up
  • Rooftop deck

Medford, Oregon

4-Plex townhomes

  • Zero-lot-line townhomes
  • 4 units from 8 modules
  • 2-hour firewall

Creswell, Oregon

Stacked accessible condo flats

  • 20 to 32 units over two to four stories
  • 8 units and 18 modules per floor

How it works

Design to move-in, in four steps.

Plan & design

Choose your model, options and colors. We build a design-to-move-in plan with you.

Financing & deposit

Reserve with a $2,500 deposit. We connect you with financing and insurance, then place your order.

Permits & building

Homes are master-planned through the Prefabricated Structures Division. Local permits and site prep are the owner's responsibility, and we support you through both.

Deliver & install

Delivery is estimated 60 days after permit approval and production payment. The balance is due on delivery.

Nonprofit housing providers: ask about our 501(c)(3) discount program.

Contact

Let's talk about your site.

Tell us what you want to build and where. We'll help you choose a plan, map out financing and permits, and get you on the production schedule.